An overhaul is the reset button on equipment performance. We plan it, organise the work and run the completion acceptance, restoring factory-level performance.



Before the overhaul: full testing and assessment to set the strip-down scope and replacement-parts list. During: key steps evidenced (clearances, torque, alignment data). After: no-load and load test runs for acceptance.
The acceptance report carries the test data and parts list, the equipment file is updated in step, and the machine goes back onto the preventive maintenance plan so performance cannot decay again.
FIELD · SCHH-2026
FIELD · SCHH-2026It depends on the scale and scope of the equipment: a single machine normally three to seven days, a whole line or a large unit one to three weeks. The accurate duration is given after strip inspection - the full picture only appears once it is opened. We list the milestones in the plan, prefabricate what can be prefabricated, and compress the shutdown window as far as possible.
FIELD · SCHH-2026Do the arithmetic: overhaul cost plus restored remaining life, against new equipment investment and depreciation. Where the base components are sound, overhaul usually pays; where they have failed or the process is about to be superseded, we say plainly that replacing is better. The assessment is issued in writing, the data is on the table, and the decision is yours.