The local receiving team for out-of-province equipment: once the supplier's machine arrives, we take over mechanical and electrical assembly, commissioning and on-line integration.



To the maker's technical documents we run unpacking acceptance, positioning, mechanical assembly and electrical termination; commissioning then advances step by step — solo run, interlocked run, on-line integration.
At commissioning close-out we deliver the commissioning records and baseline data, and open the machine's initial file — its "birth certificate" for all future maintenance.
FIELD · SCHH-2026
FIELD · SCHH-2026For most equipment, yes. With complete technical documents we carry out mechanical assembly, electrical connection and basic commissioning independently; process parameter settings are preferably guided remotely by the supplier (which also saves them travel costs). Where manufacturer-specific tools or encrypted parameters are genuinely required, we list them in writing for you to take up with the supplier - we do not stubbornly force it and waste time.
FIELD · SCHH-2026That is exactly the value of the installation records: unpacking inspection, assembly data, commissioning records and acceptance sheets are all traced and signed by both parties. Where the problem is manufacturing quality, the records are the evidence for claiming against the supplier; where it lies in installation, we take responsibility. The interface is written into the agreement in advance - when something happens, the data speaks, and there is no wrangling.