Condition watched by eye, faults reported by word of mouth, downtime kept in memory: the data black box leaves every maintenance decision without evidence.



Measurement points are chosen for diagnostic value: current, temperature, vibration, cycle time and fault codes first, with sampling rate and retention set by how fast the machine degrades — never collecting for collecting's sake.
The data feeds an OEE dashboard and early-warning thresholds with automatic alerts on anomalies; the measurement-point list and baseline data are delivered with the equipment file, directly supporting the preventive maintenance strategy.
FIELD · SCHH-2026
FIELD · SCHH-2026Yes, handled in tiers: machines with a PLC are collected through the communication port or an added communication module; relay-controlled old equipment gets sensors and energy meters to capture the key parameters (current, temperature, running signals); whatever truly cannot be collected falls back to manual entry plus dashboard statistics. Data completeness is tiered against investment - we do not chase a perfect system in one step. Getting the data of the few most critical machines running already delivers the value.
FIELD · SCHH-2026The acquisition system itself needs maintenance, but the complexity is controlled: the gateways are industrial-grade equipment, essentially maintenance-free once installed; the dashboard software is a mature product - we do not reinvent the wheel; and at handover we train your electricians in restarting, checking wiring and handling common alarms. The architecture stays simple: collect the necessary data, use reliable channels, present clear reports - no feature piling.
One phone call, and a senior engineer will walk you through how it is done, what it costs, and how long until you see results.
Scan to add Engineer Man on WeChat